Note: Below Data is only for preparing project report and checking project feasibility. Also all the reading taken considering ideal condition for working. Actual statistic result depend on labor rate, efficiency, raw material cost and quality etc.
| Material | Colour Layer | Concrete Layer |
|---|---|---|
| Colour Pigment | NA | |
| Dolomite Powder | NA | |
| Sand | NA | |
| Crush Sand + Dust | NA | |
| 06 mm Aggregate | ||
| 10 mm Aggregate | NA | |
| White Cement | NA | |
| Gray Cement |
| Machine | Qty | kW | Total kW | Cycle (s) | Cycles/Hr | Run/Hr (s) | Units/Hr |
|---|
| Charges Breakdown | Value (Per Sqft) |
|---|---|
| Total raw material cost | 0.00 |
| Electricity cost | 0.00 |
| Total labour cost | 0.00 |
| Total other cost (Overheads) | 0.00 |
| Base Production Cost | 0.00 |
| Loading / unloading / transport | 0.00 |
| Mold cost | 0.00 |
| Lacquer quote | 0.00 |
| Calculated Profit Margin | 0.00 |
| Total Market Sale Rate | 0.00 |
The investment for a fully automatic plant depends on production capacity, but at Balaji Construction Machines, we provide cost effective solutions for both single and double line setups with low maintenance requirements. Get in touch with us for the latest fully automatic paver block machine price in India and small scale paver block business setup cost estimation details.
You can use this interactive calculator to customize raw materials, labor, and power consumption rates. Once customized, click the "Print Cost Sheet / Save PDF" button to automatically save the cost sheet directly to your device.